A phased surveillance upgrade to current SIRA requirements, delivered in four weeks with minimal resident disruption.

Conceptual illustration of CCTV and access-control equipment
Conceptual engineering imagery, not a photograph of this project.

The requirement.

The residential tower’s existing CCTV system did not meet updated SIRA requirements. The upgrade needed to be completed with minimal disruption to residents while ensuring full regulatory compliance.

HYTK’s role

HYTK conducted a comprehensive site survey, designed a SIRA-compliant camera layout and executed a phased installation, including camera replacement, NVR upgrades and complete documentation.

6 wksTo certification
90 daysRetention
100%Compliance

COORDINATED SCOPE

Systems and interfaces.

ENGINEERING FOCUS

What the work had to achieve.

Full SIRA certification was achieved within six weeks, with 24/7 monitoring coverage, 90-day recording retention and remote access for building management.

TECHNOLOGY BASIS

Selected around the application.

IP CCTV · NVR recording · SIRA-compliant design

Technology references describe the engineering basis, not exclusive or authorised partnerships. Final selection depends on technical compliance, compatibility and project approvals.

Explore the technology ecosystem

RELATED SOLUTIONS

RELATED INSIGHTS

Technical notes behind the work.

All insights

LET’S BUILD WHAT COMES NEXT

Start with a conversation.

Discuss your project